cropped-1.jpgcropped-1.jpgcropped-1.jpgcropped-1.jpg
  • Home
  • About Us
  • Business
  • Barges
  • Contact
English
  • 繁體中文
  • 简体中文
✕
Vermont UM Bunkering Pte Ltd has taken delivery of newbuild bunker tanker
December 7, 2011
The ExxonMobil Asia Pacific Barge Operators Forum
December 9, 2011

6500DWT-1#(GMG10117) Naming and Delivery Ceremony

In the morning of 5th Dec 2011, Guangxin Shipbuilding & Heavy Industry Co., Ltd. held the Naming and Launching Ceremony for Vermont UM Bunkering Pte Ltd. built the 1st 6500DWT bunker barge in Zhongshan Shipyard. The main leaders and guest presented included Mr. Li Cheng (Chairman of Guangxin Holdings Group Ltd.), Mr. Feng Yurong (the Vice Mayor of Zhongshan ), Mr Zhao Wei(Director and Deputy General Manager of Guangxin Holdings Group Ltd.) Mr. Lu Chao Ying (Chairman of Goldsland Holdings Co. Ltd), Mr. Li Tongan (Chairman of GMG), and the representatives of Harbor and Shipping System of ZhongShan , CCS, Barge design party, Sinopec (Hong Kong) etc. The representative of Shipowner and the shipyard signed relevant contacts and the barge is named “ANHONG” to conclude the ceremony.
“ANHONG” ship adopts the most advanced technical design manufacturing and of double hull structure with the maximum cargo pump rate 1000 tons/hr. It becomes one of the most advanced barge in Singapore bunkering market once operate.

 

2011120916243692

2011120916245422

Share
leoma

Related posts

January 25, 2022

Vermont participated in Hong Kong Marine Pollution Response Joint Exercises


Read more

Comments are closed.

©2023 Vermont Marine Bunkering Limited. All Rights Reserved.
English
  • 繁體中文
  • 简体中文
  • English